Anchor Bolt Plan

A plan view of a building(s) foundations showing all dimensions and sections required to properly locate the anchor bolts, including the projections of the bolts above the concrete surface, required recess, etc. Column reactions (magnitude and direction), and base plate dimensions are also included.