A Pre-Engineered Building (PEB) requires less than half of the time needed to construct a concrete building of the same size

Product Reference

Zamil Steel is committed to produce contents that contributes to the education of all parties involved in the purchase of a Zamil Steel pre-engineered steel building. Every effort is made to update this contents.
 
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Anchor Bolt Plan

A plan view of a building(s) foundations showing all dimensions and sections required to properly locate the anchor bolts, including the projections of the bolts above the concrete surface, required recess, etc. Column reactions (magnitude and direction), and base plate dimensions are also included.