PEBs are made of steel, a highly homogeneous material & can work equally well in stress reversal conditions of either tension or compression
Basic Building Parameters
The basic parameters that define a pre-engineered building are:
Building height is the eave height which usually is the distance from the bottom of the main frame column base plate to the top outer point of the eave strut. When columns are recessed or elevated from finished floor, eave height is the distance from finished floor level to top of eave strut.
The longitudinal length of the building measured from out to out of end wall steel lines.
No matter what primary framing system is used, the building width is defined as the distance from outside of eave strut of one sidewall to outside of eave strut of the opposite sidewall. Building width does not include the width of Lean-To buildings or roof extensions.
The distance from outside of the outer flange of endwall columns to center line of the first interior frame column.
The distance between the center lines of two adjacent interior main frame columns. The most common bay lengths are 6 m, 7.5 m and 9 m.
This is the angle of the roof with respect to the horizontal. The most common roof slopes are 0.5/10 and 1/10. Any practical roof slope is possible.
Unless otherwise specified Zamil Steel pre-engineered buildings are designed for the following minimum loads:
Roof Live Load: 0.57 kN/m2
Design Wind Speed: 110 km/h
Design for snow loads, earth quake loads, collateral loads, crane loads or any other loading condition, if required must be specified at the time of request for quotation.
Loads are applied in accordance with the latest American codes and standards applicable to pre-engineered buildings unless otherwise requested at the time of request for quotation.
Most recent news
- Thursday, November 14, 2019
Zamil Steel Construction Company completes the erection of 120 multi-storied shelters in Bangladesh - Sunday, November 10, 2019
ZSCC awarded turnkey contract by Almutlaq Real Estate Investment in Jubail - Monday, November 4, 2019
Zamil Steel to supply pre-engineered steel buildings for integrated onshore rig in Ras Al-Khair